Directional Piercing
Installation of underground services without excavations – trenchless technologies
1
Pipe Bursting
Replacement of worn-out pipeline networks by means of new ones along with pipeline diameter increase (reduction) and its capacity

CONSTRUCTION EQUIPMENT FOR TRENCHLESS TECHNOLOGIES

Construction of a trenchless underground passage under Pobeditelei avenue in Minsk

 

UNB-30 (the work from a duct)

 

Before the beginning of new passage construction

A puncture point under Svisloch-river

 

A drill precisely goes to the target
(a trenchless passage under the ring road of Minsk)

MNB-50
(the work from a pit having sizes: 3 m x 1.2 m x 1 m)

 

A puncture with the use of MNB-50 and OR-1.5 formworks

 

Reinstallation of the storm water sewerage D 200 mm to D400 mm on Surganov str. in Minsk 
 MNB-125 equipment

 

 

 Works in OR-1.5 formworks on the depth of 5 meters.

 

 

 

 

 

 

 