CONSTRUCTION EQUIPMENT FOR TRENCHLESS TECHNOLOGIES
|
Construction of a trenchless underground passage under Pobeditelei avenue in Minsk |
UNB-30 (the work from a duct)
|
|
Before the beginning of new passage construction |
A puncture point under Svisloch-river
|
|
A drill precisely goes to the target |
MNB-50 |

A puncture with the use of MNB-50 and OR-1.5 formworks

Reinstallation of the storm water sewerage D 200 mm to D400 mm on Surganov str. in Minsk
MNB-125 equipment
Works in OR-1.5 formworks on the depth of 5 meters.






