Disassembled mobile formworks OR-1.5
The disassembled mobile formworks OR-1.5 are intended for performance of works for installation of new and replacement of old pipelines along with the subsequent installation of precast concrete rings .
| Diameter of the installed reinforced concrete ring (max) | 1.5 m |
| Belt height: - the first belt - subsequent |
0.6 m 0.8 m |
| Hoisting force (max) | 300 kN |
Reinforced concrete rings are installed inside the formworks. The formworks are to be lifted by means of two hydraulic cylinders along with support of a power beam onto the reinforced concrete ring. As the formworks are protruded cavities are formed between the ring and the formworks to be filled with the backfilled soil. Then the following ring is to be installed. After that, the cycle is to be repeated.
Description of operation stages when the formworks OR-1.5 are used:
|
|
The first belt of the OR-1.5 formworks is located on the axis of the old pipeline to be replaced or new one is to be installed with the aid of a “puncture” method. |
|
|
Soil excavation inside the OR-1.5 formworks with gradual deepening down to elevation of old or new pipelines. Formworks belts are enlarged as they are lowered to the required (designed) depth. |
|
|
Installation of MNB-50 equipment in OR-1.5 formworks. Hydraulic station connection to power block MNB-50. |
|
|
Trenchless installation or pipeline replacement from OR-1.5 formworks . |
|
|
MNB-50 equipment disassembly after completion of new pipeline construction |
|
|
Installation of the first reinforced concrete ring having diameter 1500 mm in OR-1.5 formworks of the future well and installation of the power beam along with a hydraulic cylinder of lifting belt of single formworks. Hydraulic cylinders are to be connected to the hydraulic station of MNB-50 equipment. |
|
|
Being supported onto the reinforced concrete ring via a system of lifting hydraulic cylinders the power beam presses up OR-1.5 formworks from the soil to the height of one belt |